| North Carolina State University will hold a groundbreaking ceremony for the new Greek Village on Friday, Feb. 22, at 11:15 a.m. The ceremony will be held adjacent to the Alpha Delta Pi House at 2309 South Fraternity Court. The Greek Village project is a 10-year, $104 million overhaul of the existing Greek Court. Scheduled improvements include the replacement of all current 1960s-era fraternity and sorority houses in a phased demolition, all new roadways and infrastructure as well as other amenities. (http://news.ncsu.edu/news/2008/02/016-greekvillage.php) |
|
|
NCSU Greek Village, Raleigh, NC
NCSU Greek Village is a reconstruction of an existing 12 acre parcel of property owned by North Carolina State University (NCSU). The Greek Village name is due to the fact that the land and houses are NCSU owned fraternities and sororities, unlike most campuses where the houses are privately owned. In this phase, the initial phase of the project, we will be demolishing two existing fraternity houses and all related infrastructure (roads, utilities, etc.) and reconstructing the area to create new traffic flows with updated infrastructure and more parking. In addition we will prep four pads for new houses to built on them. The new layout will include over a mile of new utility lines and over a half mile of new roads, with an additional half mile prepped for the future. We are excited to be the first contractor on this project. |
|
|
|
|
Contract SR-46- Contract
SR-46 (the SR stands for sewer replacement) is a job we’ve just begun in |
|
|
|
|
We have been chosen by BE&K Building Group, LLC to install new chilled water lines to the new Dental Sciences Building at the University of North Carolina. This will be an interesting project because multiple trades will be providing over $ 4 million of infrastructure improvements on less than an acre at depths up to 25 feet deep. As part of this project we will cross the busiest street on campus at depths up to 16 feet deep, beneath existing steam tunnels, water and gas lines, telephone and electrical duct banks, ect. while maintaining vehicular and pedestrian traffic. |
|
|
|
|
Just around the block from Beazer Homes’ very successful Quarry Lake project is the Bonnie View subdivision. Instead of an old quarry, Bonnie View is built on an old golf course. The fifty-one lots straddle the Baltimore City/County line and will likely be a strong seller in the popular Pikesville area. Like Quarry Lake, Bonnie View also contains a lot of rock for the site contractor to deal with. Gaines has spent over 50 years doing “rock” jobs. T.J. Angelozzi is the blasting subcontractor on the job. Together, Gaines and Angelozzi make a strong rock–ripping team! |
|
|
|
|
Cherry Hill, Not far from corporate headquarters in Reisterstown is the 61-unit subdivision managed by Koren Development and to be built by Lenar Homes. This projects features deep and difficult sewer and storm drain outfalls. In all the project will total 5,000 LF of sewer, 2,500 LF of water mains, 3,000 LF of storm drains, 24 sewer manholes and 54 storm structures. Built alongside of interstate 795 and near Owing Mills Town Center, this should be a convenient location for buyers and a successful project for Lenar. |
|
|
|
|
Tanyard Springs, Tanyard Springs will be the next mega subdivision in Northern Anne Arundel Co. It will ultimately consist of over 1,800 homes on approximately 280 acres along Marley Neck Blvd. Lennar Homes is the home builder and developer for this impressive project. Gaines and Company will be constructing the first 3 phases of work, which will consist of the Infrastructure Roads, Infrastructure Utilities and Section C which will provide 271 townhouse lots. During the first phases of work, Gaines will perform clearing, demolition, sediment controls, excavation, utilities, all the way through to curb & paving. Included in our scope, is 2 stream diversions with 60", 72" and 84" triple cell culverts. Additionally the initial phases include 10,347 LF of Sanitary Sewer, 10,347 LF 14,895 LF of Water mains and 7,568 LF of Storm Drain. |
|
|
|
|
Shipley's Crossing, Anne Arundel Co, MD Koch
Development and Koren Development have planed two new communities in the |
|
|
|
|
Waterford is a new community being built in the Bowie area of Prince George's Co. Washington Management is developing this 300' acre site into 126 single family home lots. Gaines and Co., is installing the utilities which include 15,984 LF of sanitary sewer and 68 manholes, 4,980 LF of pressure sewer, 14,456 LF of storm drain with 113 structures and manholes and 16,160 LF of water mains. There are also 4 culverts to be installed the largest being a 12' x 6' triple cell box culvert. It's a big job to tackle but Gaines is up to the task and is already well underway with the installation of deep sewer lines on this project.. |
|
|
|
|
New Office building Knightdale, NC
|
|
|
|
|
Arundel Preserve, Hanover MD Arundel Preserve, a new community in Anne Arundel County, is being built within a stones throw of Arundel Mills Mall and is a very unique project. Toll Brothers Inc., is developing the residential lots and COPT Development, the commercial areas. Gaines & Co., is the general contractor on this site, providing clearing, sediment control, grading, curb and gutter, and paving. We are also installing the underground utilities. To date, we have installed 8,506 LF of sewer, 6,713 LF of water and 6,328 LF of storm drain. In addition, we are clearing and grading several large parcels where we will soon begin utility work. |
|
|
|
|
Fieldstone, This
impressive project of 260 houses will rise in the |
|
|
|
|
|
Providence Place, Morrisville, NC Located in the heart of Morrisville and convenient to everything, we are proud to be partnering with K Hovnanian Homes to build this 173 acre residential subdivision. As the General Contractor for this work we are going to install over 21,000 LF of roadways, 36,000 LF of sidewalks, 24,000 LF of water and sewer main and 18,000 LF of storm drain for 346 lots. We know this is going to be a challenging site because we found rock in all of the 64 test pits we dug on site prior to signing the contract.
|
|
|
This
project of 32 estate homes will be built in the Jessup area of |
|
|
Towson Center Mall Expansion, Gaines served as a subcontractor to Potts and Callahan on Whiting Turner’s major mall expansion. It will include a Cheesecake Factory, PF Chang’s, Crate and Barrel, the Pottery Barn as well as 26 other major retailers. Intricate planning involved value engineering and included some night work to avoid traffic and construction congestion. Much coordination among the trades was required to build this addition without inconveniencing the mall patrons or the general public. Existing lines had to be kept in serviced while the new lines were being added; this required an experienced contractor with an experienced crew; such as Gaines & Co. |
|
|
Olde Towne, Olde Towne is a 600 acre exclusive urban development, consisting of 2,000 residential home sites, 360,000square feet of commercial/ retail offices and an 18 hole golf course. Olde Towne plans to preserve 240 acres in order to minimize the developments environmental footprint. This area will provide hiking trails, wildlife habitats, and public recreation. This project is being developed by Olde Towne Company LLC., with Gaines and Company installing the deep utilities. We have just completed 4,500 LF of sewer outfall consisting of 18” DIP lines in places over 26’ deep. For more information on Olde Towne, visit their website at http:///www.oldetowneraleigh.com
|
|
|
Villages of Beechtree, Upper Marlboro, MD The Villages of Beechtree is a prestigious golf course community that is located on Rt. 301 in Upper Marlboro. Developed by Ryko Development out of Houston Texas, it will total 1,680 beautiful single-family homes, 480 townhouses, and 240 multi-family homes a community center and a beautiful 34 acre man made lake that the golf course surrounds. To date we have installed miles of water, storm drain and sewer to serve North, South and East Villages including 2 large precast golf cart tunnels. Our next phase, (we have already completed 20 phases) will be North Villages 4, 5 and 6. The utility work will include over 15,000 LF sewer, 9,700 LF of water, 5,800 LF of storm drain, and 336 LF of triple 108” rcp culvert. Looks like just the right job for Gaines & Co. |
|
|
Maple Lawn Farms Westside, This
commercial project will bring prime |